Grounded Compute

California · data as of 1 Nov 2026

California: 1.6+ GW of existing data centers. 1.9+ GW in the pipeline.

211 projects tracked from county filings, state records and news. Status and permit facts link to their sources.

We haven't yet searched California for data center projects beyond the ones we track here.

Operating
1.6+ GW
178 projects
Under construction
523+ MW
12 projects
Planned
1.3+ GW
19 projects
Proposed projects; not all will be built.
211
Projects tracked
all stages
10
Counties and cities with a project
see the table below

Projects by stage

StageProjectsMW
Announced2 projects100–500 MW
Land & zoning9 projects613 MW
Power secured4 projects519 MW
Permitted4 projects96+ MW
Under construction11 projects518+ MW
Energised1 projectunder 100 MW
Operating178 projects1.6+ GW
Withdrawn2 projects100–500 MW
Total211 projects3.6+ GW

+ = at least. MW includes Grounded Compute research (Q2 2026) where no public source gives a value.

Where the pipeline is

Counties shaded by MW

San Benito CountyShasta CountySierra CountyFresno CountyAmador CountyEl Dorado CountyMonterey CountySan Bernardino CountyTehama CountyNevada CountyTuolumne CountySanta Barbara CountyTrinity CountyStanislaus CountyColusa CountyAlpine CountySiskiyou CountyDel Norte CountyInyo CountySan Joaquin CountyImperial CountyCalaveras CountyButte CountyMadera CountyVentura CountyOrange CountyKern CountyContra Costa CountyKings CountyMendocino CountySonoma CountyYuba CountyMerced CountyTulare CountySacramento CountySolano CountySan Francisco CountyMariposa CountyMarin CountySutter CountyLassen CountyRiverside CountyPlumas CountySanta Clara CountyPlacer CountySan Luis Obispo CountySan Mateo CountyMono CountySan Diego CountyNapa CountyAlameda CountyYolo CountyLake CountyLos Angeles CountyGlenn CountySanta Cruz CountyHumboldt CountyModoc CountyCA-SNC-0106 · Power secured · 100–500 MWDigital Realty · 720 2nd Street, Oakland · Operating · under 100 MWEvocative · 1400 65th Street, Suite 150, Emeryville · Operating · under 100 MWHurricane Electric · 48233 Warm Springs Boulevard, Fremont · Operating · under 100 MWHurricane Electric · 760 Mission Court, Fremont · Operating · under 100 MWPrime Data Centers · 26415 Corporate Avenue, Hayward · Operating · under 100 MWCA-ALA-0007 · Operating · under 100 MWCA-ALA-0008 · Withdrawn · under 100 MWCA-ALA-0009 · Under construction · under 100 MWCA-ALA-0010 · Operating · under 100 MWCA-ALA-0011 · Operating · under 100 MWCA-CON-0001 · Land & zoning · under 100 MWCA-LOS-0001 · Operating · under 100 MWCA-LOS-0002 · Operating · under 100 MWCA-LOS-0003 · Operating · under 100 MWCA-LOS-0004 · Operating · under 100 MWCA-LOS-0005 · Operating · under 100 MWCA-LOS-0006 · Operating · under 100 MWCA-LOS-0007 · Operating · under 100 MWCA-LOS-0008 · Operating · under 100 MWCA-LOS-0009 · Operating · under 100 MWCA-LOS-0010 · Operating · under 100 MWCA-LOS-0011 · Operating · under 100 MWCA-LOS-0012 · Operating · under 100 MWCA-LOS-0013 · Operating · under 100 MWCA-LOS-0014 · Operating · under 100 MWCA-LOS-0015 · Operating · under 100 MWCA-LOS-0016 · Operating · under 100 MWCA-LOS-0017 · Operating · under 100 MWCA-LOS-0018 · Operating · under 100 MWCA-LOS-0019 · Operating · under 100 MWCA-LOS-0020 · Operating · under 100 MWCA-LOS-0021 · Operating · under 100 MWCA-LOS-0022 · Operating · under 100 MWCA-LOS-0023 · Operating · under 100 MWCA-LOS-0024 · Operating · under 100 MWCA-LOS-0025 · Operating · under 100 MWCA-LOS-0027 · Operating · under 100 MWCA-LOS-0030 · Operating · under 100 MWCA-LOS-0032 · Operating · under 100 MWCA-LOS-0033 · Operating · under 100 MWCA-LOS-0036 · Operating · under 100 MWCA-LOS-0037 · Operating · under 100 MWCA-LOS-0038 · Operating · under 100 MWCA-LOS-0039 · Power secured · under 100 MWCA-LOS-0040 · Land & zoning · under 100 MWCA-LOS-0041 · Permitted · under 100 MWCA-LOS-0042 · Announced · under 100 MWCA-LOS-0043 · Under construction · under 100 MWCA-LOS-0044 · Land & zoning · under 100 MWCA-LOS-0045 · Land & zoning · under 100 MWCA-LOS-0046 · Operating · under 100 MWCA-ORA-0001 · Operating · under 100 MWCA-ORA-0002 · Operating · under 100 MWCA-ORA-0003 · Operating · under 100 MWCA-ORA-0004 · Operating · under 100 MWCA-ORA-0005 · Operating · under 100 MWCA-ORA-0006 · Operating · under 100 MWCA-ORA-0007 · Operating · under 100 MWCA-ORA-0008 · Energised · under 100 MWCA-SAC-0001 · Operating · under 100 MWCA-SAC-0002 · Operating · under 100 MWCA-SAC-0003 · Operating · under 100 MWCA-SAC-0004 · Operating · under 100 MWCA-SAC-0005 · Operating · under 100 MWCA-SAC-0006 · Operating · under 100 MWCA-SAC-0007 · Operating · under 100 MWCA-SAC-0008 · Operating · under 100 MWCA-SAC-0009 · Operating · under 100 MWCA-SNC-0001 · Operating · under 100 MWCA-SNC-0003 · Operating · under 100 MWCA-SNC-0004 · Operating · under 100 MWCA-SNC-0005 · Operating · under 100 MWCA-SNC-0006 · Operating · under 100 MWCA-SNC-0007 · Operating · under 100 MWCA-SNC-0008 · Operating · under 100 MWCA-SNC-0009 · Operating · under 100 MWCA-SNC-0010 · Operating · under 100 MWCA-SNC-0011 · Operating · under 100 MWCA-SNC-0012 · Operating · under 100 MWCA-SNC-0013 · Operating · under 100 MWCA-SNC-0014 · Operating · under 100 MWCA-SNC-0015 · Operating · under 100 MWCA-SNC-0016 · Operating · under 100 MWCA-SNC-0017 · Operating · under 100 MWCA-SNC-0018 · Operating · under 100 MWCA-SNC-0020 · Operating · under 100 MWCA-SNC-0021 · Operating · under 100 MWCA-SNC-0022 · Operating · under 100 MWCA-SNC-0023 · Operating · under 100 MWCA-SNC-0024 · Operating · under 100 MWCA-SNC-0025 · Operating · under 100 MWCA-SNC-0026 · Operating · under 100 MWCA-SNC-0027 · Operating · under 100 MWCA-SNC-0028 · Operating · under 100 MWCA-SNC-0030 · Operating · under 100 MWCA-SNC-0031 · Operating · under 100 MWCA-SNC-0032 · Operating · under 100 MWCA-SNC-0033 · Operating · under 100 MWCA-SNC-0034 · Operating · under 100 MWCA-SNC-0035 · Operating · under 100 MWCA-SNC-0036 · Operating · under 100 MWCA-SNC-0037 · Operating · under 100 MWCA-SNC-0038 · Operating · under 100 MWCA-SNC-0039 · Operating · under 100 MWCA-SNC-0040 · Operating · under 100 MWCA-SNC-0041 · Operating · under 100 MWCA-SNC-0042 · Operating · under 100 MWCA-SNC-0043 · Operating · under 100 MWCA-SNC-0044 · Operating · under 100 MWCA-SNC-0045 · Operating · under 100 MWCA-SNC-0046 · Operating · under 100 MWCA-SNC-0047 · Operating · under 100 MWCA-SNC-0048 · Operating · under 100 MWCA-SNC-0049 · Operating · under 100 MWCA-SNC-0050 · Operating · under 100 MWCA-SNC-0051 · Operating · under 100 MWCA-SNC-0052 · Operating · under 100 MWCA-SNC-0053 · Operating · under 100 MWCA-SNC-0054 · Operating · under 100 MWCA-SNC-0055 · Operating · under 100 MWCA-SNC-0057 · Operating · under 100 MWCA-SNC-0058 · Operating · under 100 MWCA-SNC-0059 · Operating · under 100 MWCA-SNC-0060 · Operating · under 100 MWCA-SNC-0061 · Operating · under 100 MWCA-SNC-0062 · Operating · under 100 MWCA-SNC-0064 · Operating · under 100 MWCA-SNC-0067 · Operating · under 100 MWCA-SNC-0068 · Operating · under 100 MWCA-SNC-0069 · Operating · under 100 MWCA-SNC-0070 · Operating · under 100 MWCA-SNC-0074 · Operating · under 100 MWCA-SNC-0075 · Power secured · under 100 MWCA-SNC-0076 · Under construction · under 100 MWCA-SNC-0077 · Operating · under 100 MWCA-SNC-0078 · Operating · under 100 MWCA-SNC-0079 · Operating · under 100 MWCA-SNC-0080 · Operating · under 100 MWCA-SNC-0082 · Under construction · under 100 MW · campus total, counted onceCA-SNC-0083 · Operating · under 100 MWCA-SNC-0084 · Operating · under 100 MWCA-SNC-0085 · Operating · under 100 MWCA-SNC-0086 · Operating · under 100 MWCA-SNC-0087 · Under construction · under 100 MWCA-SNC-0088 · Operating · under 100 MWCA-SNC-0089 · Under construction · under 100 MW · campus total, counted onceCA-SNC-0090 · Under construction · under 100 MWCA-SNC-0091 · Operating · under 100 MWCA-SNC-0092 · Land & zoning · under 100 MWCA-SNC-0093 · Operating · under 100 MWCA-SNC-0094 · Operating · under 100 MWCA-SNC-0095 · Permitted · under 100 MWCA-SNC-0096 · Withdrawn · under 100 MWCA-SNC-0097 · Operating · under 100 MWCA-SNC-0098 · Under construction · under 100 MWCA-SNC-0099 · Under construction · under 100 MW · campus total, counted onceCA-SNC-0100 · Permitted · under 100 MW · campus total, counted onceCA-SNC-0101 · Land & zoning · under 100 MWCA-SNC-0102 · Operating · under 100 MWCA-SNC-0103 · Announced · under 100 MWCA-SNC-0104 · Power secured · under 100 MWCA-SNC-0105 · Land & zoning · under 100 MWCA-SNC-0107 · Land & zoning · under 100 MWCA-SNC-0108 · Operating · under 100 MWCA-SNC-0109 · Operating · under 100 MWCA-SNC-0110 · Operating · under 100 MWCA-SNC-0111 · Operating · under 100 MWCA-SNC-0112 · Operating · under 100 MWCA-SNC-0113 · Permitted · under 100 MWCA-SNC-0114 · Operating · under 100 MWCA-SNC-0115 · Under construction · under 100 MWCA-SNC-0116 · Land & zoning · under 100 MWCA-SNC-0117 · Operating · under 100 MWCA-SNC-0118 · Under construction · under 100 MWCA-SNC-0119 · Operating · under 100 MWCA-SND-0001 · Operating · under 100 MWCA-SND-0002 · Operating · under 100 MWCA-SND-0003 · Operating · under 100 MWCA-SND-0004 · Operating · under 100 MWCA-SND-0005 · Operating · under 100 MWCA-SND-0006 · Operating · under 100 MWCA-SND-0007 · Operating · under 100 MWCA-SND-0008 · Operating · under 100 MWCA-SND-0009 · Operating · under 100 MWCA-SND-0010 · Operating · under 100 MWCA-SNF-0001 · Operating · under 100 MWCA-SNF-0002 · Operating · under 100 MWCA-SNF-0003 · Operating · under 100 MWCA-SNF-0004 · Operating · under 100 MWCA-SNF-0005 · Operating · under 100 MWCA-SNJ-0001 · Operating · under 100 MWCA-SNL-0001 · Operating · under 100 MWCA-ALA-0005 · Operating · MW not reportedCA-LOS-0026 · Operating · MW not reportedCA-LOS-0028 · Operating · MW not reportedCA-LOS-0029 · Operating · MW not reportedCA-LOS-0031 · Operating · MW not reportedCA-LOS-0034 · Operating · MW not reportedCA-LOS-0035 · Operating · MW not reportedCA-SNC-0002 · Operating · MW not reportedCA-SNC-0019 · Operating · MW not reportedCA-SNC-0029 · Operating · MW not reportedCA-SNC-0056 · Operating · MW not reportedCA-SNC-0063 · Operating · MW not reportedCA-SNC-0065 · Operating · MW not reportedCA-SNC-0066 · Operating · MW not reportedCA-SNC-0071 · Operating · MW not reportedCA-SNC-0072 · Operating · MW not reportedCA-SNC-0073 · Operating · MW not reportedCA-SNC-0081 · Operating · MW not reportedDigital RealtyEvocativeHurricane ElectricPrime Data Centers

211 of 211 projects mapped · locations from our project list · as of 1 Nov 2026

County shading

  • Under 500 MW
  • 500–2,000 MW
  • 2,000+ MW

Data center projects

  • Planned
  • Permitted
  • Under construction
  • Operating
  • Withdrawn

Pin size: MW

Counties with the most MW

+ = at least

Moratoriums

As of 31 Oct 2026, we count at least 30 local data center pauses in force in California, 2 bans and 16 proposals, across its counties and cities. At state level: checked, nothing found.

California moratorium tracker: every row with its source

Counties with a project (10)

Counties with 3 or more projects have their own page

CountyProjectsUnder construction or operatingMW
Santa Clara County1191062.5+ GW
Los Angeles County4640488+ MW
Alameda County1110304+ MW
San Diego County101018 MW
Sacramento County9991 MW
Orange County8852 MW
San Francisco County5566 MW
Contra Costa County10under 100 MW
San Joaquin County11under 100 MW
San Luis Obispo County11under 100 MW
10 counties211190Calculated
Show all 10

Projects

5 projects named free · 206 more in the California file

Developer · addressCountyStageMW rangeDatesID
Digital Realty · 720 2nd Street, OaklandAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0001
Evocative · 1400 65th Street, Suite 150, EmeryvilleAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0002
Hurricane Electric · 48233 Warm Springs Boulevard, FremontAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0003
Hurricane Electric · 760 Mission Court, FremontAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0004
Prime Data Centers · 26415 Corporate Avenue, HaywardAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0006
Developer and address: in the paid fileAlameda CountyOperatingMW not reportedFirst recorded 25 Oct 2026CA-ALA-0005
Developer and address: in the paid fileAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0007
Developer and address: in the paid fileAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0010
Developer and address: in the paid fileAlameda CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-ALA-0011
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0001
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0002
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0003
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0004
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0005
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0006
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0007
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0008
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0009
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0010
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0011
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0012
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0013
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0014
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0015
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0016
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0017
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0018
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0019
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0020
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0021
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0022
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWLast change 1 Nov 2026CA-LOS-0023
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0024
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0025
Developer and address: in the paid fileLos Angeles CountyOperatingMW not reportedFirst recorded 25 Oct 2026CA-LOS-0026
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0027
Developer and address: in the paid fileLos Angeles CountyOperatingMW not reportedFirst recorded 25 Oct 2026CA-LOS-0028
Developer and address: in the paid fileLos Angeles CountyOperatingMW not reportedFirst recorded 25 Oct 2026CA-LOS-0029
Developer and address: in the paid fileLos Angeles CountyOperatingunder 100 MWFirst recorded 25 Oct 2026CA-LOS-0030
Developer and address: in the paid fileLos Angeles CountyOperatingMW not reportedFirst recorded 25 Oct 2026CA-LOS-0031
171 more projects load as you scroll

206 more projects: names, developers and sources in the California file →

Show all 211

FAQ

How many data centers are under construction in California?
11 of 211, as of 1 Nov 2026. 178 more operating.
How much data center capacity is in California's pipeline?
1.9+ GW in the pipeline (523+ MW under construction, 1.3+ GW planned), and 1.6+ GW operating. These are floors: where no public source gives a MW value, the total uses Grounded Compute research (Q2 2026).
Which California county has the most data center projects?
Santa Clara County: 119 projects.

Cite this page

Source: Grounded Compute, California data centers, 1 Nov 2026. https://groundedcompute.com/us/california

The California file: every tracked project, with its sources

  • California file: every project named, with developer and address
  • MW, and source links on status and permit fields
  • Excel workbook + CSV, refreshed monthly
Price set at launchCalifornia · one named user · licences open soonJoin the waitlistFree sample county

Data centers in other states

Nearby

Largest